1 Prefilled by OMH and included with letter.
2 Required if MWBE goals are assigned. Goals are identified in the Appendix A-1(a).
3 Include blank copy with Amendment 0.
4 Original signed Federal certification forms are required if Federal funds are included in the contract.
5 Only required if amendment includes change in scope of work.